NVMe Test Suites

The test suites on this page may be downloaded and used for internal purposes only. The test suites may not be commercialized in any way without express permission of the UNH-IOL.

The NVMe testing service currently offers the following test plans. These documents are constantly being updated to improve readability and to reflect the current specifications. Please contact us if you would like more information or have questions about the NVMe testing service.

When testing based on the following test suites is performed, all reports generated will be digitally signed using an Adobe digital certificate. Upon reception of the report, the recipient can verify its authenticity using our document validation instructions.

IOL

Conformance

Status
Fully Documented (Active, see notes)
Revision
1.1b
Testing Days Needed
Abstract
This test suite outlines the current conformance requirements for the 1.1b revision of the NVMe Integrators List.
Status
Draft (Active)
Revision
1.2
Testing Days Needed
1 week
Abstract
This is a draft test procedure, documenting the testing that will be implemented at the June 2015 NVMe Plugfest. Changes to the test procedures described here should be expected between now and the June 2015 plugfest.

Interoperability

Status
Fully Documented (Active, see notes)
Revision
1.1b
Testing Days Needed
1 week
Abstract
This test suite outlines the current interoperability requirements for the 1.1b revision of the NVMe Integrators List.
Status
Draft (Active)
Revision
1.2
Testing Days Needed
1 week
Abstract
This is a draft test procedure, documenting the testing that will be implemented at the June 2015 NVMe Plugfest. Changes to the test procedures described here should be expected between now and the June 2015 plugfest.

Key

Fully Documented
Draft