NVMe Test Suites

The test suites on this page may be downloaded and used for internal purposes only. The test suites may not be commercialized in any way without express permission of the UNH-IOL.

The NVMe testing service currently offers the following test plans. These documents are constantly being updated to improve readability and to reflect the current specifications. Please contact us if you would like more information or have questions about the NVMe testing service.

When testing based on the following test suites is performed, all reports generated will be digitally signed using an Adobe digital certificate. Upon reception of the report, the recipient can verify its authenticity using our document validation instructions.

IOL

Conformance

Status
Fully Documented (Active)
Revision
6.0
Testing Days Needed
1 week
Last Modified
2016-08-30
Abstract
This suite documents conformance test requirements for listing products to version 6.0 of the NVMe Integrators List. These requirements will go into effect at NVMe Plugfest #6, in October 2016.
Status
Fully Documented (Active)
Revision
1.2.1
Testing Days Needed
1 Week
Last Modified
2015-11-23
Abstract
This test procedure documents the testing performed at the February 2016 NVMe Plugfest. The test procedure outlines the requirements for listing products on the NVMe Integrators List during and after that plugfest. These requirements will be obsoleted after NVMe Plugfest #6 in October 2016, at which the v6.0 requirements will go into effect.

Interoperability

Status
Fully Documented (Active)
Revision
v6.0
Testing Days Needed
1 week
Last Modified
2016-08-30
Abstract
This suite documents interop test requirements for listing products to version 6.0 of the NVMe Integrators List. These requirements will go into effect at NVMe Plugfest #6, in October 2016.
Status
Fully Documented (Active)
Revision
1.2.1
Testing Days Needed
1 Week
Last Modified
2015-11-19
Abstract
This test procedure documents the testing performed at the February 2016 NVMe Plugfest. The test procedure outlines the requirements for listing products on the NVMe Integrators List during and after that plugfest. These requirements will be obsoleted after NVMe Plugfest #6 in October 2016, at which the v6.0 requirements will go into effect.