Introduction     [Top]

The Fibre Channel Consortium currently offers the following Services. These documents are constantly being updated to improve readability and to reflect the current specifications. Please contact us if you would like more information or have questions about the Fibre Channel Consortium

Document Certification     [Top]

When testing based on the following test suites is performed, all reports generated will be digitally signed using an Adobe digital certificate. Upon reception of the report, the recipient can verify its authenticity using the instructions provided at http://www.iol.unh.edu/certifyDoc.

 

IOL     [Top]

Conformance     [Top]

FC-AL-2 7.0 Initialization States Test Suite [Top]
Last Modified: 3/31/2007
Revision: 1.4
Status: Fully Documented (Active)
Testing Days Needed: 10 days
Abstract: This test suite covers the various transitions and actions required in the Loop Initialization procedure as defined in Clause 10 of FC-AL-2 Rev 7.0.
Notes: Previous versions available: v1.0, v1.1, v1.2
Test Suite: PDF Click to download PDF
 
FC-AL-2 7.0 Remaining States Test Suite [Top]
Last Modified: 8/15/2006
Revision: 1.21
Status: Fully Documented (Active)
Testing Days Needed: 5 days
Abstract: This test suite covers the various transitions and actions defined in the Loop Port State Machine (Monitoring, Arbitrating, Arbitration Won, Open, Opened, and Xmitted Close states) as defined in Clause 8.4 of FC-AL-2 Rev 7.0.
Notes: Previous versions available: v1.0, v1.1
Test Suite: PDF Click to download PDF
Sample Report: PDF Click to download PDF
 
FC-BB-5 (FCoE) Encapsulation Test Suite [Top]
Last Modified: 12/15/2008
Revision: 1.0
Status: Draft (Inactive)
Testing Days Needed: 30 days
Abstract: This test suite covers the proper Fibre Channel over Ethernet encapsulation of the DUT, verifying frame fields contain proper values within a properly formatted frame.
Test Suite: PDF Click to download PDF
 
FC-1 Test Suite [Top]
Last Modified: 2/23/2008
Revision: 4.3
Status: Fully Documented (Active)
Testing Days Needed: 5 days
Abstract: This test suite covers the FC Synchronization Receiver State Diagram as defined in FC-FS Rev 1.7 Clause 6.1
Notes: Previous versions available: v3.11 v4.1
Test Suite: PDF Click to download PDF
Sample Report: PDF Click to download PDF
 
FC-DA Clause 4 Test Suite [Top]
Last Modified: 8/15/2006
Revision: 1.21
Status: Fully Documented (Active)
Testing Days Needed: 5 days
Abstract: This test suite covers FC-DA Rev 3.1 Clause 4 requirements for end devices (i.e. Nx_Ports). Subclauses 4.1, 4.2, 4.3, 4.4 and 4.5 are covered.
Test Suite: PDF Click to download PDF
Sample Report: PDF Click to download PDF
 
FC-FS Clause 15 Test Suite [Top]
Last Modified: 8/4/2008
Revision: 1.6
Status: Fully Documented (Active)
Testing Days Needed: 5 days
Abstract: This test suite covers Clause 15 of FC-FS Rev. 1.9. Clause 15 encompasses the Login and Service Parameters where an Nx_Port establishes its operating environment with a Fabric, if present, and other destination Nx_Ports with which it communicates.
Notes: Previous versions available: v1.0, v1.2 v1.3 v1.4 v1.5
Test Suite: PDF Click to download PDF
 
FC-FS Clause 7 Test Suite [Top]
Last Modified: 6/6/2008
Revision: 1.4.1
Status: Fully Documented (Partially Implemented)
Testing Days Needed: 5 days
Abstract: This test suite covers Clause 7 of FC-FS Rev 1.9. Clause 7 encompasses the Point-to-Point login procedure defined by the FC_Port State Machine.
Test Suite: PDF Click to download PDF
 
FC-FLA 2.7 Test Suite [Top]
Last Modified: 8/15/2006
Revision: 1.11
Status: Fully Documented (Active)
Testing Days Needed: 5 days
Abstract: This test suite covers the required, prohibited and optional features defined in Clauses 4, 5, 6 and 8 of FC-FLA Rev 2.7. FC-FLA defines these features for the interoperation of FL_Ports, NL_Ports and N_Ports within a fabric environment.
Test Suite: PDF Click to download PDF
 
FC-MI-2 Clause 5 Loop Behaviors Test Suite [Top]
Last Modified: 8/15/2006
Revision: 1.01
Status: Fully Documented (Active)
Testing Days Needed: 5 days
Abstract: This test suite covers FC-MI-2 Rev 2.59 Clause 5 loop behaviors required for Fabric Devices.
Test Suite: PDF Click to download PDF
 
FC-PI-4 Clause 5 Bit Error Rate Test Suite [Top]
Last Modified: 5/4/2009
Revision: 1.1
Status: Fully Documented (Active, see notes)
Testing Days Needed: 1-5 Days
Abstract: This test suite covers Optical and Electrical Bit Error Rate for 1G, 2G, 4G and 8G Fibre Channel interfaces as defined in FC-PI-4 Rev 8 Clause 5.
Notes: *Optical BER testing is currently not available for testing. v1.0
Test Suite: PDF Click to download PDF
 
FC-PI-2 Clause 6 Optical Test Suite [Top]
Last Modified: 10/23/2007
Revision: 1.0
Status: Fully Documented (Active)
Testing Days Needed: 1 - 5 days
Abstract: This test suite covers transmitter characteristics for 1G, 2G, and 4G optical Fibre Channel interfaces as defined in FC-PI-2 Rev 10 Clause 6.
Notes: Previous versions available: v0.51
Test Suite: PDF Click to download PDF
 
FC-PI-4 Clause 6 Optical Test Suite [Top]
Last Modified: 6/26/2008
Revision: 1.0
Status: Fully Documented (Partially Implemented)
Testing Days Needed: 1-5 days
Abstract: This test suite covers transmitter characteristics for 1G, 2G, 4G and 8G optical Fibre Channel interfaces as defined in FC-PI-4 Rev 8 Clause 6.
Test Suite: PDF Click to download PDF
 
FC-PI-2 Clause 9 Electrical Test Suite [Top]
Last Modified: 3/16/2009
Revision: 1.2
Status: Fully Documented (Partially Implemented)
Testing Days Needed: 1-5 days
Abstract: This test suite covers transmitter and receiver characteristics for 1G, 2G, and 4G electrical Fibre Channel interfaces defined in FC-PI-2 Rev 10 Clause 9.
Notes: Previous versions available: v0.21 v1.0 v1.1
Test Suite: PDF Click to download PDF
 
FC-SW-2 Test Suite [Top]
Last Modified: 8/15/2006
Revision: 1.11
Status: Draft (Inactive)
Testing Days Needed: 5 days
Abstract: This test suite covers switch behaviors as defined in FC-SW-2 Rev 5.3 Subclauses 5.8, 6.1, 7.1, 7.2, 7.3 and 7.4.
Test Suite: PDF Click to download PDF
 
HBA API 1 Test Suite [Top]
Last Modified: 6/6/2003
Revision: 1.0
Status: Fully Documented (Active)
Testing Days Needed: 3 days
Abstract: This test suite covers the HBA API function calls specified in FC-HBA Rev 7.
Test Suite: PDF Click to download PDF
 
HBA API 2 Test Suite [Top]
Last Modified: 8/15/2006
Revision: 1.01
Status: Fully Documented (Active)
Testing Days Needed: 3 days
Abstract: This test suite covers the HBA API function calls specified in FC-HBA Rev 9.
Test Suite: PDF Click to download PDF
 
SCD-2001v2 SANmark NL Port Behavior [Top]
Last Modified: 7/22/2001
Revision: 2
Status: Fully Documented (Active)
Testing Days Needed: 1 Week
Abstract: This conformance test suite SCD2001 provides tests of basic operation of NL_Ports on a loop. This test validates good citizenship of devices on a Fibre Channel Arbitrated loop. It covers basic loop initialization operation, including appropriate responses to LIP reception and appropriate LIP origination.
Notes: Application: 2001v2
Test Suite: PDF Click to download PDF
 
SCD-2003v1 Fabric Attached Devices [Top]
Last Modified: 7/22/2001
Revision: 1
Status: Fully Documented (Active)
Testing Days Needed: 1 Week
Abstract: SCD2003 provides tests of Fabric attached NL_Ports and N_Ports. This test covers behaviors that public devices should have related to FLOGI, registration with the name server, use of the name server, and reponse to RSCN reception.
Notes: Application: 2003v1
Test Suite: PDF Click to download PDF
 
SCD-3001v2a1 E_Port Conformance Test [Top]
Last Modified: 3/25/2002
Revision: 2a1
Status: Fully Documented (Active)
Testing Days Needed: 1 Week
Abstract: SCD3001 provides tests of E_Port connectivity in a two switch fabric. This test covers E_Port initialization, Principal Switch selection, Address Distribution, and FSPF path selection.
Notes: Application: 3001v2a1

Additional Documents: SCD-3001vM, SCD-3001_comments

Test Suite: PDF Click to download PDF
 
SCD-3002 SANmark FL Port Behavior [Top]
Last Modified: 10/19/2001
Revision: F
Status: Fully Documented (Active)
Testing Days Needed: 1 Week
Abstract: SCD3002 provides tests of basic operation of FL_Ports on a loop. This test validates good citizenship of devices on a Fibre Channel Arbitrated loop. It covers basic loop initialization operation, including appropriate responses to LIP reception and appropriate LIP origination.
Notes: Application: 3002v2

Additional documents: SCD-3002v2

Test Suite: PDF Click to download PDF
 
SCD-3010v1 SANMark Registered State Change Notification [Top]
Last Modified: 9/5/2002
Revision: 1
Status: Fully Documented (Active)
Testing Days Needed: 1 Week
Abstract: This conformance test suite, SCD-3010, provides tests of the Fabric for proper operation with respect to Registered State Change Notifications (RSCNs).
Notes: Application: 3010v1
Test Suite: PDF Click to download PDF
 
SCD-3020v2 Zoning [Top]
Last Modified: 5/18/2004
Revision: 1
Status: Fully Documented (Active)
Testing Days Needed: 1 Week
Abstract: This conformance test suite, SCD-3020, tests zoning as defined in FC-SW-2. The Tests are designed around the fabric, and name server login procedure, and registration. The tests verify that a device will be visible and be able to locate other devices on the name server when the devices are in the same zone, and that they will not be visible if not in the same zone. It also verifies that the correct frames are exchanged on switch ISLs when zones are configured, changed or deleted. For the SANmark Qualified Program, primary focus will be initially applied to on-the-wire protocol analysis tests, which explicitly define test setup procedures, and entrance / exit criteria using available Fibre Channel analyzer test equipment. Further term focus will be applied to more general behavior at the sub-system and full system level. SCD-3020 consists entirely of Fibre Channel Zoning tests.
Notes: Application: 3020v1
Test Suite: PDF Click to download PDF
 

Interoperability     [Top]

Large Loop Build Test Suite [Top]
Last Modified: 8/15/2006
Revision: 1.21
Status: Fully Documented (Active)
Testing Days Needed: 5 days
Abstract: This test suite covers the interaction of different devices during loop initialization and recovery in a multi-vendor Arbitrated Loop.
Notes: Older versions available: v1.0
Test Suite: PDF Click to download PDF
 
Fabric Build Test Suite [Top]
Last Modified: 8/15/2006
Revision: 2.11
Status: Fully Documented (Active)
Testing Days Needed: 5 days
Abstract: This test suite describes the building and testing of a Switch Fabric with mutliple end device pairs.
Notes: Older versions available: v1.0
Test Suite: PDF Click to download PDF
Sample Report: PDF Click to download PDF
 
Fabric Pair Test Suite [Top]
Last Modified: 8/15/2006
Revision: 2.11
Status: Draft (Active)
Testing Days Needed: 5 days
Abstract: This test suite examines interoperability of N_Port and NL_port devices across a Switch.
Test Suite: PDF Click to download PDF
 
Multi-Target Loop Test Suite [Top]
Last Modified: 9/18/2006
Revision: 1.1
Status: Fully Documented (Active)
Testing Days Needed: 5 days
Abstract: This test verifies that a Fibre Channel device (Initiator) can operate on a single loop with multiple Fibre Channel Targets performing SCSI operations.
Test Suite: PDF Click to download PDF
 
Multi-Initiator Loop Test Suite [Top]
Last Modified: 8/15/2006
Revision: 1.21
Status: Fully Documented (Active)
Testing Days Needed: 5 days
Abstract: This test verfies that a Fibre Channel device (target) can operate on a single loop with multiple Fibre Channel Initiators performing SCSI operations.
Test Suite: PDF Click to download PDF
Sample Report: PDF Click to download PDF
 
Point to Point Interoperability [Top]
Last Modified: 8/15/2006
Revision: 1.01
Status: Fully Documented (Active)
Testing Days Needed: 1 week
Abstract: This suite of tests has been developed to help implementers identify problems that Fibre Channel devices may have in establishing link and exchanging packets with each other. The tests do not determine if a product conforms to the T11 Standards. Rather, they provide one method to verify that the two devices can exchange packets within the bit error ratio specifications established by the FC-PI-2 standard when operating over various channels. The interoperability test suite focuses on two areas of functionality to simulate a real-world environment: the exchange of packets to produce a packet error ratio that is low enough to meet a desired bit error ratio, and the ability to detect and establish a link at the optimal speed between two devices that make up a link segment.
Test Suite: PDF Click to download PDF
 
Multi-Target Fabric Test Suite [Top]
Last Modified: 11/29/2006
Revision: 1.2
Status: Fully Documented (Active)
Testing Days Needed: 5 days
Abstract: This test verifies that a Fibre Channel device can operate on a fabric with multiple Fibre Channel Targets performing SCSI operations.